BUILDINGS/WATER SUPPLY/SEWERAGE Projects

Elevating Communities, Ensuring Hygiene: Embark on a transformative journey with 7-Star as we spearhead innovative projects in Buildings, Water Supply, and Sewerage. From visionary structures to sustainable water solutions and advanced sewerage systems, our commitment to excellence shapes the future of urban living and environmental well-being. Explore a horizon of possibilities with our dynamic projects that redefine standards and uplift the quality of life for all.

S/NO

NAME OF PROJECT

STATUS

1

Construction Of External Development Works At University Of Kotli, Ajk

Completed

2

Water Supply Scheme, THQ Samahni, district Bhimber AJK

Completed

3

Construction of Govt. College of Technical Bhimber Phase-I District Bhimber.

Completed

4

Installation of Tubewell- DhQ Hospital Mirpur AJK

Completed

5

Improvement of Industrial Infrastructure with New Industrial Area & Small Industrial Estate, District Mirpur

Completed

6

Remaining work OPD Block and Main Block (Wards) 150 Bedded DHQ Hospital, Pallandri, District Sudhnoti

Completed

7

Completion of Remaining Civil Works 150 Bedded DHQ Hospital Pallandri, District Sudhnuti Azad Jammu & Kashmir

Completed

8

Water Supply Scheme Bhimber Town Phase-IV District Bhimber.

Completed

9

 A- Construction Of 2x Double Storey School building Blocks (40284sft) And 2x Single Storey Tuck Shops (480 Sft) Including Earthwork Required For Construction Of Blocks, Car Parking Area, Boundary Wall (1750 Feet) Playing Areas And Green Areas for Army public School 

B- Construction Of 5 X B Type House (27005 Sft Including Porches Measuring 3490 Sft) And 5 X D Type Houses (19670 Sft Including Porch Measuring 2210.5 Sft) Including Earthwork Required For Construction Of Houses, Boundary Walls, Retaining Wall, Pathways and entrance Gates

Completed

10

IDBs Assisted Projects’’ Support to basic education development (Pak 0148)’’, NCB No. STBED-Works/106, Package # 40, STBED-BMR-02, District Bhimber

Completed

11

Construction of Faculty & Staff Residences and common facilities of new campus at Jari Mirpur AJK. Package -II (Revised)

Completed

12

IDBs Assisted Projects’’ Support to basic education development (Pak 0148)’’ NCB No. STBED-Works/105, Package # 38, STBED-MPR-03, District Mirpur AJK.

Completed

13

Up-Gradation of UECT into MUST Package -4.Construction of External Services Road, Water Supply, External Sewerage etc. (Revised)

Completed

14

Establishment of Library and student service center MUST Mirpur (Revised)

Completed

15

Construction of Greater Water Supply Scheme Kotli Remaining Work. (Revised)

Completed

16

Construction of Girls, Boys’ hostel and boundary wall at New Campus Jari Mirpur at Jari Package –I (Revised)

Completed

17

Up-Gradation of 250 Bedded DHQ Hospital Mirpur as 500 Bedded Divisional Headquarter Hospital Mirpur Phase-I (Revised)

Completed

18

Water Supply Scheme Chakswari Phase-II Kanaily and Panyam Package0II District: Mirpur AJK.

Completed

19

Construction of Protection Wall Along Left Bank of Rivr Poonch at Mandi Peerain Distt.Kotli A.K. (Revised)

Completed

20

Construction of High Court / Shariat Court Circuit Bench Mirpur (Revised)

Completed

ROADS / BRIDGES Projects

Paving the Way to Progress: 7-Star’s Commitment to Excellence in Roads and Bridges, Connecting Communities and Forging Pathways to a Brighter Future

S/NO

NAME OF PROJECT

STATUS

1

W/ Improvement Of Road From Patrolling Post Kotla Arab Ali Khan To Pakistan Boundry Via Machora Mandowal Tehsil Kharian Part-B, L=3.5 Km

Completed

2

Special Repair For Gujrat Bhimber Road Kotla Arab Ali Khan To Azad Kashmir Check Post L= 6km, District Gujrat

Completed

3

Upgradation of Jatlan Ali Baig Road, Length 3.65 KM District Bhimber

Completed

4

Reconstruction of Bhong Head to ChechiyanJatlan Road (Existing Damaged Track) (Length 14 KM) District Mirpur AJK

Completed

5

Construction of Haul Road Quaid-e-Azam Chowk to Chungi (length 03 KM) District Mirpur AJK

Completed

6

Construction of Khokhran Dhal Mahmood Raypur RCC Bridge, Span 180 Meter district Mirpur (A.K).

Completed

7

Improvement & Re-Conditioning of Mong to Pallandri via Challar road length 18 Km district Sudhnuti

Completed

8

Improvement & Reconditioning of Mirpur Plak road from km no.10 RD 15 to Km no.15 RD 24 and Km no.41 RD 16 to Km no.56 RD 24) length 20.57 Km district Mirpur A.K. (Revised)

Completed

9

Improvement & Re-Conditioning of Azad Pattan Pallandri road length 22 Km district Sudhnuti. ( Revised)

Completed

10

Improvement & Re-Conditioning of Bhimber Jatlan Road Km no.01 to 14 lengths 14 Km district Bhimber. (Revised)

Completed

11

Improvement & Re-Conditioning of Bhimber Jatlan road km no.15 to 28 lengths 14 Km district Bhimber. (Revised)

Completed

12

Improvement & Reconditioning of Dudyal-Siakh road (length 13.59 Km) district Mirpur (A.K).

Completed

13

Up-Gradation and Reconditioning of Bhimber Gujrat road length 8.50 Km district Bhimber. (Revised)

Completed

14

Improvement & Reconditioning of Gulpur Narr Plak road, remaining portion jandi gala to plak from km no. 16 to 27.50, length 12.50 km,district Kotli A.K.

Completed

15

Up-Gradation & Reconditiongin Of Kot Jamel To Iftikharabad Length 11 Km. District Bhimber Azad Kashmir (Revised)

Completed

16

Up-Gradation of Samahni Charhoi peer Gali Road (Km. 28 to 42 Km) Length 15 Km District. Bhimber A.K

Completed

17

Reconditioning of Gulpur To Plak road Length 15 Km, Distt. Kotli.( Revised)

Completed

18

Construction of RCC Bridge at Pir Dingianwala span 120 Meter I/C approach road 1.25 Km Distt. Bhimber A.K.

Completed

19

Improvement and Reconditioning Mirpur Islamgarh Road Km.no 15 to 40 Length 25 Km District Mirpur Azad Kashmir.

Completed